0TB804.9 |
![]() |
價(jià)格:6061 元(人民幣) | 產(chǎn)地:美國 |
最少起訂量:1件 | 發(fā)貨地:上海 | |
上架時(shí)間:2018-01-09 07:36:29 | 瀏覽量:101 | |
上海心雨機(jī)電設(shè)備有限公司
![]() |
||
經(jīng)營模式:貿(mào)易公司 | 公司類型:私營股份有限公司 | |
所屬行業(yè):綜合 | 主要客戶:全國 | |
![]() ![]() |
聯(lián)系人:閆經(jīng)理 (小姐) | 手機(jī):18717727482 |
電話: |
傳真: |
郵箱:395717253@qq.com | 地址:上海市嘉定區(qū)德富路1211號(hào)205室 |
0TB804.9 貝加萊計(jì)數(shù)器模塊X20DC4395 The contract with Shell includes the supply of 12 MS-700 slimbore subsea wellhead systems and seven 42-inch liners, with delivery beginning in July of 2007. Once installed, the MS-700 slimbore wellhead systems will enable Shell to drill and complete wells in conjunction with their reduced bore riser and a surface blowout-preventer (BOP), thus exploiting the drilling capabilities of rigs with conventional operating envelopes, typically less than the actual water depth at Parque das Conchas (up to
1930m water depth). Cleaning a pipeline is often the simplest way to achieve greater production. Many studies have shown that even small irregularities inside the pipe can cause turbulence in the product flow. Turbulence increases friction loss, reduces capacity and puts an unnecessary load on the pumps and compressors. Greater amounts of debris or deposits in the line increase turbulence, reduce pipe bore and decrease capacity. The equipment was manufactured in Florence, Italy and shipped to Peru in March 2010. With the use of trucks prohibited in the environmentally sensitive region, GE overcame the logistical challenge of 'on-time' delivery by taking advantage of seasonal swelling of the Amazon and Urubamba Rivers to transport the two 60-tonne modules to the Malvinas plant.
The VetcoGray SemStar5 was awarded a ‘Spotlight on New Technology Award’ at this year’s Offshore Technology Conference. The contract with Shell includes the supply of 12 MS-700 slimbore subsea wellhead systems and seven 42-inch liners, with delivery beginning in July of 2007. Once installed, the MS-700 slimbore wellhead systems will enable Shell to drill and complete wells in conjunction with their reduced bore riser and a surface blowout-preventer (BOP), thus exploiting the drilling capabilities of rigs with conventional operating envelopes, typically less than the actual water depth at Parque das Conchas (up to
1930m water depth). The contract with Shell includes the supply of 12 MS-700 slimbore subsea wellhead systems and seven 42-inch liners, with delivery beginning in July of 2007. Once installed, the MS-700 slimbore wellhead systems will enable Shell to drill and complete wells in conjunction with their reduced bore riser and a surface blowout-preventer (BOP), thus exploiting the drilling capabilities of rigs with conventional operating envelopes, typically less than the actual water depth at Parque das Conchas (up to
1930m water depth). The equipment was manufactured in Florence, Italy and shipped to Peru in March 2010. With the use of trucks prohibited in the environmentally sensitive region, GE overcame the logistical challenge of 'on-time' delivery by taking advantage of seasonal swelling of the Amazon and Urubamba Rivers to transport the two 60-tonne modules to the Malvinas plant. |
版權(quán)聲明:以上所展示的信息由會(huì)員自行提供,內(nèi)容的真實(shí)性、準(zhǔn)確性和合法性由發(fā)布會(huì)員負(fù)責(zé)。機(jī)電之家對(duì)此不承擔(dān)任何責(zé)任。 友情提醒:為規(guī)避購買風(fēng)險(xiǎn),建議您在購買相關(guān)產(chǎn)品前務(wù)必確認(rèn)供應(yīng)商資質(zhì)及產(chǎn)品質(zhì)量。 |
機(jī)電之家網(wǎng) - 機(jī)電行業(yè)權(quán)威網(wǎng)絡(luò)宣傳媒體
關(guān)于我們 | 聯(lián)系我們 | 廣告合作 | 付款方式 | 使用幫助 | 會(huì)員助手 | 免費(fèi)鏈接Copyright 2025 jdzj.com All Rights Reserved??技術(shù)支持:機(jī)電之家 服務(wù)熱線:0571-87774297
網(wǎng)站經(jīng)營許可證:浙B2-20080178